# Durham building permits and inspections

Triangle building

Durham uses a joint city-county building department, with Dplans for plan review and LDO for permit and inspection tasks.

You are building a home in Durham and need to submit plans, arrange trade permits, and keep inspections moving. Start with the joint City-County Building & Safety Department. Use Dplans for digital plan review and the Land Development Office portal for permit and inspection tasks.

[Durham's current department page describes services for both the city and county](https://www.durhamnc.gov/293/City-County-Building-Safety). Older records and some linked pages use “City-County Inspections.” Match the service to your parcel and scope rather than opening separate city and county applications because the names differ.

## Confirm the services your parcel needs

Collect the address, parcel identification, proposed use, and site plan before contacting staff. Confirm the building-permit route and the separate planning, utility, and environmental approvals. Assign someone to track each approval. A joint building department still has separate approval steps.

The [LDO portal identifies several departments involved in development](https://ldo4.durhamnc.gov/DurhamWeb/). Use those links for utility, stormwater, or other department questions. Keep each approval with its responsible office and reference number.

For a lot using on-site wastewater, ask Environmental Health about the applicable authorization before building-permit issuance. [G.S. 130A-338 establishes that prerequisite and its statutory alternatives](https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_130A/GS_130A-338.html). Do not substitute a soil discussion or preliminary site opinion for the authorization the issuing office requires.

The [Triangle hub](/triangle/) connects neighboring permit guides. Use Durham's own instructions for a Durham project rather than importing a Wake County checklist.

## Use Dplans for plan review and LDO for permit tasks

[The department directs commercial and residential plan reviews to Dplans](https://www.durhamnc.gov/293/City-County-Building-Safety). Its [Dplans page provides the official login link](https://www.durhamnc.gov/467/Dplans). Enter through that route and follow the current instructions for the proposed project type.

LDO supports permit tracking, trade applications, payments, and inspection management. [Its landing page also explains the Client Identification Account, or CID](https://ldo4.durhamnc.gov/DurhamWeb/). Staff must create the CID before the company can register its email for company-specific tasks. Start that process before an urgent inspection request.

Use this table to track tasks in each system:

| Task | Starting point | Record to retain |
| --- | --- | --- |
| Confirm plan-review submission | Dplans instructions | Project reference and submitted revision |
| Resolve review comments | Assigned review process | Responses and replacement documents |
| Manage trade permit tasks | LDO | Permit numbers and company association |
| Request inspections | LDO with appropriate access | Requested type and scheduled date |
| Review results | LDO record or inspection search | Result and corrective comments |
| Resolve another agency's hold | Responsible department | Written approval or remaining condition |

Assign a named applicant to watch both systems. If the architect, builder, and trades manage separate records, name who sends updates to the field. Confirm that each person can access the records needed for their tasks.

## Build the inspection plan around the actual house

[Durham publishes inspection requirements for single-family residences, duplexes, and townhouses](https://www.durhamnc.gov/304/Inspection-Requirements). Review that list with the trades and the permit card. Ask staff which stages and project-specific conditions apply to the proposed foundation and construction method.

The building list includes footing, foundation, slab, full framing, insulation, and final stages. Durham separately labels open-floor and sheathing inspections as courtesy inspections. Do not describe those courtesy visits as universally mandatory. Confirm their use and timing with the department.

Keep this as a planning outline, then follow the project-specific requirements:

| Stage to discuss | Coordination question for the builder |
| --- | --- |
| Footing and foundation | What must remain exposed before concrete or backfill? |
| Slab and under-slab work | Which trade approvals precede the pour? |
| Floor and sheathing | Are courtesy inspections requested for this assembly? |
| Full framing and rough-ins | Are all affected trades ready for the required checks? |
| Insulation | Are required documents and concealed details ready? |
| Trade and building finals | Which approvals and supporting records remain open? |

The local requirements include survey and other document checks at particular stages. Get the current list before scheduling. This outline is not the complete inspection checklist. Your permit's requirements and the department's direction control the work.

## Name who requests inspections and checks results

Identify the person who requests each inspection and the person who reads its result. Agree on the exact stage name. Confirm that the work area is ready and accessible before making the request. Give the superintendent the permit number for that inspection.

[Durham County's inspection information directs building, electrical, plumbing, and standard mechanical requests to LDO](https://www.dconc.gov/county-departments/departments-a-e/city-county-inspections). It says the permit applicant needs login credentials for scheduling. Check that the correct applicant can access the record before the crew depends on the appointment.

Use the [trade handoff guide](/guides/trade-handoffs/) to define what the next crew receives. A scheduled visit is not a passed inspection. Review the posted result and comments before releasing work that covers the inspected area.

North Carolina law directs inspectors to make the inspections necessary to assess work under the permit. [G.S. 160D-1113 states that authority](https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_160D/GS_160D-1113.html). Ask the department when a proposed sequence would conceal work before inspection.

## Resolve corrections through the project record

When an inspection fails, distribute the exact comments to the affected lead. Identify who owns each correction. Photograph completed work when useful and preserve required documents. Request reinspection through the proper record after the area is ready.

If a correction requires a plan change, ask how the change must enter review. Keep the approved revision available to the crew. Avoid treating a conversation with one person as permission to ignore the current issued drawings. Retain written direction when the project depends on an interpretation.

For a rough-in conflict, identify the affected assembly, inspection, and responsible trades. Bring the relevant trades together around the current detail. Obtain any required revised approval before proceeding. Then tell the next crew what is ready and give it the approved detail.

## Look up permit and inspection history

[LDO provides public searches without login for permits, parcels, and inspections](https://ldo4.durhamnc.gov/DurhamWeb/). Its introduction says most development records accepted for review since October 2007 are available there. For earlier or missing records, ask the department what it retains and how to request them.

[The inspection search accepts a permit number](https://ldo4.durhamnc.gov/DurhamWeb/Search/InspectionSearch). Use the number from the actual file rather than relying only on an address match. Review linked trade permits and results. Save the comments that explain an open condition.

Do not treat an empty search as proof of unpermitted work or proof that no work occurred. Ask staff to confirm the property, date range, and department covered by the search. For a purchase or existing-house investigation, ask what the record establishes about the scope you are evaluating.

## Track closeout as its own stage

Before the final visit, list outstanding trade results, documents, and other approvals. Assign each item and a completion date. Confirm that the finished work matches the approved plans. Keep the final result and issued certificate with the project records.

[G.S. 160D-1116 ties the certificate of compliance to final inspection and limits occupancy before the required certificate](https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_160D/GS_160D-1116.html). Ask staff about any proposed temporary occupancy arrangement. A scheduled final inspection or a utility connection does not replace the issued certificate.

For a separate Wake project, use the [Wake County guide](/guides/wake-county-building-permits/). For hiring questions alongside permit work, use [finding Triangle subcontractors](/guides/find-subcontractors-raleigh/).

## Where Cercha fits

Cercha helps you discover nearby trades through Search and review their portfolios and endorsements. Messages can begin a conversation about Durham experience and scope. Confirm permit access, inspection duties, and project approvals through the responsible companies and city-county systems.

Published 2026.10.14. Updated 2026.10.14.

[More guides: Triangle market](</guides/topics/triangle-market/>)

## Related guides

- [Wake County building permits: who issues them where](</guides/wake-county-building-permits/>)
- [Trade handoffs: who accepts the work before the next crew](</guides/trade-handoffs/>)
- [How to find subcontractors in Raleigh and the Triangle](</guides/find-subcontractors-raleigh/>)

## Build your connections

[Ask about the beta](</beta/>)

## Sources

<a id="source-1"></a>

1. City of Durham. (n.d.). *City-County Building & Safety*. Retrieved October 14, 2026, from https://www.durhamnc.gov/293/City-County-Building-Safety

<a id="source-2"></a>

2. City of Durham. (n.d.). *City of Durham Land Development Office*. Retrieved October 14, 2026, from https://ldo4.durhamnc.gov/DurhamWeb/

<a id="source-3"></a>

3. N.C. Gen. Stat. § 130A-338. https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_130A/GS_130A-338.html

<a id="source-4"></a>

4. City of Durham. (n.d.). *Dplans*. Retrieved October 14, 2026, from https://www.durhamnc.gov/467/Dplans

<a id="source-5"></a>

5. City of Durham. (n.d.). *Inspection Requirements*. Retrieved October 14, 2026, from https://www.durhamnc.gov/304/Inspection-Requirements

<a id="source-6"></a>

6. Durham County. (n.d.). *City-County Building & Safety*. Retrieved October 14, 2026, from https://www.dconc.gov/county-departments/departments-a-e/city-county-inspections

<a id="source-7"></a>

7. N.C. Gen. Stat. § 160D-1113. https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_160D/GS_160D-1113.html

<a id="source-8"></a>

8. City of Durham. (n.d.). *Inspection Search*. Retrieved October 14, 2026, from https://ldo4.durhamnc.gov/DurhamWeb/Search/InspectionSearch

<a id="source-9"></a>

9. N.C. Gen. Stat. § 160D-1116. https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_160D/GS_160D-1116.html