Construction calculators

Concrete calculator

Check cubic yards from your pour dimensions before you call the concrete supplier.

Choose the value already specified for your job.
Software range: 0 to 100. Up to six decimal places.
Software range: 1 to 100000. Whole numbers only.
Software range: 0.000001 to 10000. Up to six decimal places.
Software range: 0.000001 to 10000. Up to six decimal places.
Software range: 0.000001 to 1200. Up to six decimal places.

Estimate

Net volume (yd³): 1.234568; Volume with allowance (yd³): 1.234568; Estimated volume (yd³): 1.23; Rounded upward to 0.25 yd³: 1.25
How this is calculated

Slab yd³ = L × W × T × q ÷ 324. Footing yd³ = L × W × D × q ÷ 3888. Column yd³ = π × d² × H × q ÷ 15552. Volume with allowance = net volume × (1 + w ÷ 100).

L and W are feet for slabs; T is inches. Footing L is feet, W and D are inches. Column d is inches, H is feet. q is pieces, w is percent. The cylinder equation is our geometric derivation. The quarter-yard ceiling is a display choice.

Volumes show six decimal places; the main estimate shows two. The order option rounds upward to a quarter cubic yard from the unrounded result. Confirm the supplier increment.

Ordinary displays round half up: an exact halfway value rounds upward. Display rounding never changes the purchase ceiling.

Estimate only. Dimensions must already be selected. This model does not subtract reinforcement, embedded posts, or voids. Confirm order increments with your supplier. For one delivery, sum net volumes before applying one allowance and ceiling.

Estimate only. No structural sizing, loads, spans, strengths, or code-compliance decisions are calculated.

Volume estimate only. Dimensions must already be selected. Confirm the allowance and delivery increment with your concrete supplier.

You need a pour quantity before you call dispatch or compare your concrete sub’s takeoff. Choose a slab, rectangular footing, or solid round column. Enter its dimensions, identical-piece count, and waste allowance to estimate cubic yards.

Measure the filled shape

For a slab, enter length and width in feet and thickness in inches. For a footing, use length in feet with width and depth in inches. For a column, enter the inside filled diameter in inches and filled height in feet. Check the unit beside each field before copying dimensions from your site notes.

Use the quantity field only for pieces with identical dimensions. Split a stepped footing or changing slab thickness into separate sections. Record each section on your sketch so another person can trace the volume back to the pour.

Check the formula and allowance

Sakrete’s estimating guide calculates rectangular volume and divides cubic feet by twenty-seven to obtain cubic yards. This tool converts inches to feet before multiplying. For columns, it derives volume from circular area times height: pi times radius squared times height.

The calculator multiplies net volume by one plus your waste percentage divided by one hundred. NRMCA’s ordering guide discusses contingency above plan quantities. Choose the allowance with the people responsible for the pour rather than treating the initial zero as an ordering recommendation.

Read the result before placing the order

For example, a nine-by-nine-foot slab at four inches thick contains one cubic yard. Entering ten percent waste produces 1.10 cubic yards. The tool’s upward quarter-yard option gives 1.25 cubic yards. Confirm that increment with the supplier.

For one delivery covering several shapes, add net volumes before applying one shared allowance and order rounding. Adding separate rounded orders changes the total. The model does not subtract reinforcement, embedded posts, or voids; keep those assumptions with the takeoff.

Check the inputs and results

Scroll to read all columns.

Input Unit and accepted values
Shape Slab, rectangular footing, or solid round column
Slab dimensions Length and width: feet, greater than zero through 10,000. Thickness: inches, greater than zero through 1,200.
Footing dimensions Length: feet, greater than zero through 10,000. Width and depth: inches, greater than zero through 1,200.
Column dimensions Diameter: inches, greater than zero through 1,200. Height: feet, greater than zero through 10,000.
Identical pieces Whole count, 1 through 100,000
Waste Percent, 0 through 100

Enter positive dimensions and a whole piece count. Waste can be zero. The quarter-yard option rounds the full adjusted volume upward; confirm that increment with dispatch.

Before you release the pour

Keep feet, inches, and cubic yards distinct; NIST’s unit table provides conversion references. Record the filled dimensions before comparing a supplier’s quantity.

For round forms, check the selected product’s dimensions and instructions against the Sonotube round-form reference. This calculator models a solid cylinder, without a widened base or hollow core.

Assign curing separately using NRMCA’s curing guidance. Confirm the permit checkpoint through Raleigh’s inspection sequence or your local office before releasing the pour.

Review the takeoff with the concrete sub and the concrete supplier. Use the material-delivery guide to assign site access and the receiver.

Return to the construction tools hub for the other quantity checks and printable records.

Where Cercha fits

Use the Cercha app’s Search filters to find a concrete trade by trade, ZIP code, and radius. Review portfolio photos and use Messages to discuss the pour scope. Keep the quantity check with your project notes.

Sources

  1. Sakrete. (n.d.). Estimating Bagged Concrete Jobs. Retrieved October 14, 2026, from https://www.sakrete.com/blog/post/estimating-bagged-concrete-jobs/
  2. National Ready Mixed Concrete Association. (n.d.). CIP 31: Ordering Ready Mixed Concrete. Retrieved October 14, 2026, from https://www.nrmca.org/wp-content/uploads/2021/01/31pr.pdf
  3. NIST. (2025, August 18). Guide to the SI, Appendix B.8. https://www.nist.gov/pml/special-publication-811/nist-guide-si-appendix-b-conversion-factors/nist-guide-si-appendix-b8
  4. Sonoco. (n.d.). Sonotube Round Concrete Forms brochure. Retrieved October 14, 2026, from https://www.sonoco.com/sites/default/files/files/Sonotube%C2%AE%20Round%20Concrete%20Forms%20product%20brochure.pdf
  5. National Ready Mixed Concrete Association. (n.d.). CIP 11 - Curing In-Place Concrete. Concrete in Practice. Retrieved October 14, 2026, from https://www.nrmca.org/wp-content/uploads/2021/01/11pr.pdf
  6. City of Raleigh. (2026, October 12). Residential Inspections. Raleighnc.gov. https://raleighnc.gov/permits/services/residential-inspections